Panama Canal
ENTERING DARIAN LOCKS FROM CARIBBEAN
CANAL CREW ATTACHING CABLES TO ENGINE
PANAMA CANAL PILOT CAME ABOARD
CABLES LEFT AND RIGHT FRONT AND REAR ATTACHED TO ENGINES PULL BOATS THROUGH LOCKS
WE SHARE EMPTY LOCK WITH OTHER SHIP
GATE CLOSING BEHIND THE BOAT
LOCK IS FILLED WITH WATER
GLENN RAISED UP AND MOVING THROUGH THE SECOND SET OF LOCKS
RAISED UP 85' WE SAIL OUT ON LAKE GATUN
MIRA FLORES LOCKS ON PACIFIC SIDE
BOAT MOVING THROUGH MIRA FLORES LOCKS
CONTROL BUILDING FOR THE LOCKS

AFTER CROSSING THE ISTHMUS WE WENT TO THE PEARL ISLANDS